Three Tiers. One Standard.
Everything is turnkey. Nothing is SaaS.
Every Aradia appliance includes hardware, staging, model configuration, agent compilation, and benchmarking. No hidden fees. No per-token billing. No subscription creep. Below you will find the complete pricing for all three tiers, the optional SLA, and the payback math that shows when your total cost of ownership crosses into positive territory vs. public cloud APIs.
Aradia DGX Spark
$15,125 turnkey
Timeline: 2β4 weeks (target staging & dispatch)
Monthly SLA: $1,500/month (optional)
Payment Terms: 100% upfront ($15,125) to begin staging
[What's_Included]
- + NVIDIA DGX Spark (GB10 Grace Blackwell Superchip)
- + 128 GB LPDDR5x coherent unified system memory
- + 4 TB NVMe M.2 with self-encryption
- + 20-core Arm CPU (10Γ Cortex-X925 + 10Γ Cortex-A725)
- + 1β5 Concurrent Users or Agents (single user or small team)
- + INT4-AutoRound Model Quantization
- + vLLM Continuous Batching Configured
- + Hardened Linux + Docker Containerization
- + Air-gapped Default (Zero Open Inbound Ports)
- + 48-Hour Staging Burn-In & Benchmarking
- + 14-Day Re-staging Guarantee
[PAYBACK_Analysis]
Typical capital payback: 4β9 months when replacing an active 2β5 user/agent cloud API & seat stack ($1,800β$3,500/mo)βcomputed against the $15,125 turnkey CapEx, exactly as the Payback Matrix below does. When the optional Managed SLA is included, break-even is measured against the full 5-Yr outlay of $105,125 (hardware + 60 months of SLA) rather than hardware alone. Plus immediate Day-1 elimination of third-party data/privilege exposure liability. After payback, marginal token cost approaches zero. Five-year TCO comparison at $2,500/month baseline: pure CapEx $15,125 (Aradia) vs. $212,520 (cloud) = $197,395 net savings. Including the optional Managed SLA (60 months Γ $1,500), Aradia sits at $105,125 for $107,395 saved. Estimated hardware residual value after 5 years is $750 β held by you as an asset, not deducted from the figures above.
Aradia DGX Station
$194,093 turnkey
Timeline: 4β8 weeks (target staging & dispatch)
Monthly SLA: $5,000/month (optional)
70% Procurement Deposit: $135,865.10 to begin staging
30% Balance: $58,227.90 due upon Staging Validation (prior to shipment)
[What's_Included]
- + NVIDIA GB300 Grace Blackwell Ultra Desktop Superchip
- + 748 GB coherent memory (252 GB HBM3e + 496 GB LPDDR5X)
- + 72-core Neoverse V2 CPU
- + 10β50 Concurrent Users or Agents (small team to medium company)
- + AWQ-INT4 Model Quantization
- + vLLM Continuous Batching Configured
- + Hardened Linux + Docker Containerization
- + Air-gapped Default (Zero Open Inbound Ports)
- + 48-Hour Staging Burn-In & Benchmarking
- + 14-Day Re-staging Guarantee
[PAYBACK_Analysis]
Typical capital payback: 7β14 months when replacing departmental cloud AI & enterprise seat spend ($15,000β$25,000+/mo)βcomputed against the $194,093 turnkey CapEx, exactly as the Payback Matrix below does. When the optional Managed SLA is included, break-even is measured against the full 5-Yr outlay of $494,093 rather than hardware alone. Plus Year-1 IRS Section 179 tax depreciation eligibility. After payback, marginal token cost approaches zero. Five-year TCO comparison at $25,000/month baseline: pure CapEx $194,093 (Aradia) vs. $2,125,195 (cloud) = $1,931,102 net savings. Including the optional Managed SLA (60 months Γ $5,000), Aradia sits at $494,093 for $1,631,102 saved. Estimated hardware residual value after 5 years is $19,400 β held by you as an asset, not deducted from the figures above.
Aradia DGX B200
$505,500 turnkey
Timeline: 8β12 weeks (target staging & dispatch)
Monthly SLA: $12,500/month (optional)
70% Procurement Deposit: $353,850 to begin staging
30% Balance: $151,650 due upon Staging Validation (prior to shipment)
[What's_Included]
- + 8x NVIDIA GB100 Blackwell GPUs (1,440 GB HBM3e, 64 TB/s)
- + 2x Intel Xeon Platinum 8570 (112 cores, 2 TB RAM configurable to 4 TB)
- + 14.4 TB/s NVLink bandwidth via 2x NVSwitch
- + 10 RU rack, ~14.3 kW (6x IEC60320-1 locking cords, 200β240V AC)
- + 48-Hour Staging Burn-In & Benchmarking
- + 100β200 Concurrent Users or Agents (medium sized company)
- + FP8 / INT4 Hybrid Model Quantization
- + vLLM Multi-GPU Continuous Batching via NVLink
- + Hardened Linux + Docker Containerization
- + Air-gapped Default (Zero Open Inbound Ports)
[PAYBACK_Analysis]
Typical capital payback: 6β15 months against high-volume enterprise cloud GPU cluster leasing & API spend ($35,000β$85,000+/mo)βcomputed against the $505,500 turnkey CapEx, exactly as the Payback Matrix below does. When the optional Managed SLA is included, break-even is measured against the full 5-Yr outlay of $1,255,500 rather than hardware alone. Converting 100% sunk cloud OpEx into a depreciable balance-sheet asset. After payback, marginal token cost approaches zero. Five-year TCO comparison at $100,000/month baseline: pure CapEx $505,500 (Aradia) vs. $8,500,782 (cloud) = $7,995,282 net savings. Including the optional Managed SLA (60 months Γ $12,500), Aradia sits at $1,255,500 for $7,245,282 saved. Estimated hardware residual value after 5 years is $50,500 β held by you as an asset, not deducted from the figures above.
SLA Details
What the optional Managed Service Level Agreement covers and standard response timelines.
Every Aradia deployment ships with an optional managed SLA. You retain absolute control over when we touch your system.
+ SLA Coverage: on-demand priority support, local model updates, re-compilation of agent weights, and security vulnerability patching.
+ Change Orders: SLA hours cover hardware, OS, inference engine, and core OpenClaw stack maintenance only. Custom business workflow integration or bespoke development (or support without an active SLA) is billed at a flat $450/hour rate (1-hour minimum).
> SLA Metrics by Tier
./SLA activation begins on the appliance delivery date. SLA is billed monthly, prepaid in advance.
The Payback Matrix
Input your current monthly cloud API spend to calculate the exact break-even period and projected 5-year savings when converting to an Aradia private appliance.
Configure Parameters
Set your current token metrics and select an appliance tier:
> TCO PARAMETERS: Values incorporate hardware and staging setup, plus a baseline 17.5% compound annual API cost inflation rate on public cloud models. Aradia TCO defaults to pure CapEx; toggle the optional Managed SLA to include 60 months of service fees.
> TAX SHIELD (SECTION 179): Savings displayed do not include potential Section 179 tax deductions (US). Deducting the full purchase price of the appliance in Year 1 may reduce effective hardware costs by an additional ~21%.
> ASSET RETENTION: Unlike cloud subscriptions (100% sunk cost), Aradia appliances are physical assets. TCO calculations do not subtract the 5-year secondary market residual value of the hardware.
Structured Payment Terms
Our structured corporate transactions are configured to mitigate capital risk for both parties.
// Risk-Isolated Deposits
The initial deposit fully covers the baseline raw hardware cost prior to vendor procurement. This structure protects Aradia from carrying raw capital or inventory exposure on custom physical orders. DGX Spark is billed 100% upfront ($15,125); DGX Station and DGX B200 follow the 70%/30% deposit structure below.
// SLA Balance & Billing
The final contract balance is due once our Staging Studio Validation Report is provided. Managed SLA invoicing is billed monthly, pre-paid in advance, beginning on the appliance's delivery day.
Once the hardware purchase order is placed with our distributor, 100% of the Consolidated Hardware Cost is strictly non-refundable, plus 25% of the Aradia Staging & Markup Fee to cover the distributor PO, sunk engineering labor, and hardware depreciation. Cancellations before PO placement are charged only at confirmed procurement cost.
All physical units are backed by the NVIDIA OEM Hardware Warranty plus Aradia’s 14-Day Re-Staging Guarantee if configuration drift is detected.